OR-Notes are a series of introductory notes on topics that fall under the broad heading of the field of operations research (OR). They were originally used by me in an introductory OR course I give at Imperial College. They are now available for use by any students and teachers interested in OR subject to the following conditions.

A full list of the topics available in OR-Notes can be found here.


Linear programming formulation examples

Linear programming example 1996 MBA exam

A cargo plane has three compartments for storing cargo: front, centre and rear. These compartments have the following limits on both weight and space:

Compartment   Weight capacity (tonnes)   Space capacity (cubic metres)
Front         10                         6800
Centre        16                         8700
Rear          8                          5300

Furthermore, the weight of the cargo in the respective compartments must be the same proportion of that compartment's weight capacity to maintain the balance of the plane.

The following four cargoes are available for shipment on the next flight:

Cargo   Weight (tonnes)   Volume (cubic metres/tonne)  Profit (£/tonne)
C1      18                480                          310
C2      15                650                          380
C3      23                580                          350
C4      12                390                          285

Any proportion of these cargoes can be accepted. The objective is to determine how much (if any) of each cargo C1, C2, C3 and C4 should be accepted and how to distribute each among the compartments so that the total profit for the flight is maximised.

Solution

Variables

We need to decide how much of each of the four cargoes to put in each of the three compartments. Hence let:

xij be the number of tonnes of cargo i (i=1,2,3,4 for C1, C2, C3 and C4 respectively) that is put into compartment j (j=1 for Front, j=2 for Centre and j=3 for Rear) where xij >=0 i=1,2,3,4; j=1,2,3

Note here that we are explicitly told we can split the cargoes into any proportions (fractions) that we like.

Constraints

x11 + x12 + x13 <= 18
x21 + x22 + x23 <= 15
x31 + x32 + x33 <= 23
x41 + x42 + x43 <= 12

x11 + x21 + x31 + x41 <= 10
x12 + x22 + x32 + x42 <= 16
x13 + x23 + x33 + x43 <= 8

480x11 + 650x21 + 580x31 + 390x41 <= 6800
480x12 + 650x22 + 580x32 + 390x42 <= 8700
480x13 + 650x23 + 580x33 + 390x43 <= 5300

[x11 + x21 + x31 + x41]/10 = [x12 + x22 + x32 + x42]/16 = [x13 + x23 + x33 + x43]/8

Objective

The objective is to maximise total profit, i.e.

maximise 310[x11+ x12+x13] + 380[x21+ x22+x23] + 350[x31+ x32+x33] + 285[x41+ x42+x43]

The basic assumptions are:

The advantages of using a software package to solve the above linear program, rather than a judgemental approach are:


Linear programming example 1995 MBA exam

Briefly describe the main steps in using mathematical modelling to support management.

A canning company operates two canning plants. The growers are willing to supply fresh fruits in the following amounts:

Shipping costs in £ per tonne are:

         To: Plant A   Plant B
From: S1     3         3.5
      S2     2         2.5
      S3     6         4

Plant capacities and labour costs are:

              Plant A       Plant B
Capacity      460 tonnes    560 tonnes
Labour cost   £26/tonne     £21/tonne

The canned fruits are sold at £50/tonne to the distributors. The company can sell at this price all they can produce.

The objective is to find the best mixture of the quantities supplied by the three growers to the two plants so that the company maximises its profits.

Solution

The main steps in using mathematical modelling to support management are:

To formulate the problem given in the question as a linear program we need to define:

Variables

We need to decide how much to supply from each of the three growers to each of the two canning plants. Hence let xij be the number of tonnes supplied from grower i (i=1,2,3 for S1, S2 and S3 respectively) to plant j (j=1 for Plant A and j=2 for Plant B) where xij >=0 i=1,2,3; j=1,2

Constraints

x11 + x12 <= 200
x21 + x22 <= 310
x31 + x32 <= 420

x11 + x21 + x31 <= 460
x12 + x22 + x32 <= 560

Objective

The objective is to maximise total profit, i.e.

maximise revenue - grower supply cost - grower shipping cost - plant labour cost

and this is

maximise 50SUM{i=1,2,3}SUM{j=1,2}xij - 11(x11+x12) - 10(x21+x22) - 9(x31+x32) - 3x11 - 2x21 - 6x31 - 3.5x12 - 2.5x22 - 4x32 - 26SUM{i=1,2,3}xi1 - 21SUM{i=1,2,3}xi2

The dual values associated with the supply and plant capacity constraints in the optimal solution of the above linear program tell us by how much the optimal objective function value will change if we change the right-hand side of the corresponding constraints

The basic assumptions are:


Linear programming example 1993 UG exam

The production manager of a chemical plant is attempting to devise a shift pattern for his workforce. Each day of every working week is divided into three eight-hour shift periods (00:01-08:00, 08:01-16:00, 16:01-24:00) denoted by night, day and late respectively. The plant must be manned at all times and the minimum number of workers required for each of these shifts over any working week is as below:

          Mon   Tues     Wed     Thur    Fri      Sat     Sun
Night     5     3        2       4       3        2       2
Day       7     8        9       5       7        2       5
Late      9     10       10      7       11       2       2

The union agreement governing acceptable shifts for workers is as follows:

  1. Each worker is assigned to work either a night shift or a day shift or a late shift and once a worker has been assigned to a shift they must remain on the same shift every day that they work.
  2. Each worker works four consecutive days during any seven day period.

In total there are currently 60 workers.

Solution

Variables

The union agreement is such that any worker can only start their four consecutive work days on one of the seven days (Mon to Sun) and in one of the three eight-hour shifts (night, day, late).

Let:

Monday be day 1, Tuesday be day 2, ..., Sunday be day 7

Night be shift 1, Day be shift 2, Late be shift 3

then the variables are:

Nij the number of workers starting their four consecutive work days on day i (i=1,...,7) and shift j (j=1,...,3)

Note here that strictly these variables should be integer but, as we are explicitly told to formulate the problem as a linear program in part (a) of the question, we allow them to take fractional values.

Constraints

SUM{i=1 to 7} SUM{j=1 to 3} Nij <= 60

since each worker can start his working week only once during the seven day, three shift, week

let Dij be the (known) number of workers required on day i (i=1,...,7) and shift period j (j=1,...,3) e.g. D53=11 (Friday, Late)

then the constraints are

Monday:     N1j + N7j + N6j + N5j >= D1j   j=1,...,3 
Tuesday:    N2j + N1j + N7j + N6j >= D2j   j=1,...,3 
Wednesday:  N3j + N2j + N1j + N7j >= D3j   j=1,...,3 
Thursday:   N4j + N3j + N2j + N1j >= D4j   j=1,...,3 
Friday:     N5j + N4j + N3j + N2j >= D5j   j=1,...,3 
Saturday:   N6j + N5j + N4j + N3j >= D6j   j=1,...,3 
Sunday:     N7j + N6j + N5j + N4j >= D7j   j=1,...,3 

The logic here is straightforward, for example for Wednesday (day 3) the workers working shift j on day 3 either started on Wednesday (day 3, N3j) or on Tuesday (day 2, N2j) or on Monday (day 1, N1j) or on Sunday (day 7, N7j) - so the sum of these variables is the total number of workers on duty on day 3 in shift j and this must be at least the minimum number required (D3j).

Objective

It appears from the question that the production manager's objective is simply to find a feasible schedule so any objective is possible. Logically however he might be interested in reducing the size of the workforce so the objective function could be:

minimise SUM{i=1 to 7} SUM{j=1 to 3} Nij

where all variables Nij>=0 and continuous (i.e. can take fractional values).

This completes the formulation of the problem as a linear program.

Some of the advantages and disadvantages of solving this problem as a linear program are:


Linear programming example 1991 UG exam

A company manufactures four products (1,2,3,4) on two machines (X and Y). The time (in minutes) to process one unit of each product on each machine is shown below:

                            Machine
                      X               Y
Product       1       10              27
              2       12              19
              3       13              33
              4        8              23

The profit per unit for each product (1,2,3,4) is £10, £12, £17 and £8 respectively. Product 1 must be produced on both machines X and Y but products 2, 3 and 4 can be produced on either machine.

The factory is very small and this means that floor space is very limited. Only one week's production is stored in 50 square metres of floor space where the floor space taken up by each product is 0.1, 0.15, 0.5 and 0.05 (square metres) for products 1, 2, 3 and 4 respectively.

Customer requirements mean that the amount of product 3 produced should be related to the amount of product 2 produced. Over a week approximately twice as many units of product 2 should be produced as product 3.

Machine X is out of action (for maintenance/because of breakdown) 5% of the time and machine Y 7% of the time.

Assuming a working week 35 hours long formulate the problem of how to manufacture these products as a linear program.

Solution

Variables

Essentially we are interested in the amount produced on each machine. Hence let:

xi = amount of product i (i=1,2,3,4) produced on machine X per week

yi = amount of product i (i=2,3,4) produced on machine Y per week

where xi >= 0 i=1,2,3,4 and yi >= 0 i=2,3,4

Note here that as product 1 must be processed on both machines X and Y we do not define y1.

Constraints

0.1x1 + 0.15(x2 + y2) + 0.5(x3 + y3) + 0.05(x4 + y4) <= 50

x2 + y2 = 2(x3 + y3)

Note here that as this is only an approximate (±5% say) constraint we might do better to express this constraint as

0.95[2(x3 + y3)] <= x2 + y2 <= 1.05[2(x3 + y3)]

10x1 + 12x2 + 13x3 + 8x4 <= 0.95(35)(60) (machine X)

27x1 + 19y2 + 33y3 + 23y4 <= 0.93(35)(60) (machine Y)

Objective

maximise profit, i.e.

maximise 10x1 + 12(x2 + y2) + 17(x3 + y3) + 8(x4 + y4)


Linear programming example 1987 UG exam

A company is planning its production schedule over the next six months (it is currently the end of month 2). The demand (in units) for its product over that timescale is as shown below:

Month              3        4       5       6        7       8
Demand             5000     6000    6500    7000     8000    9500

The company currently has in stock: 1000 units which were produced in month 2; 2000 units which were produced in month 1; 500 units which were produced in month 0.

The company can only produce up to 6000 units per month and the managing director has stated that stocks must be built up to help meet demand in months 5, 6, 7 and 8. Each unit produced costs £15 and the cost of holding stock is estimated to be £0.75 per unit per month (based upon the stock held at the beginning of each month).

The company has a major problem with deterioration of stock in that the stock inspection which takes place at the end of each month regularly identifies ruined stock (costing the company £25 per unit). It is estimated that, on average, the stock inspection at the end of month t will show that 11% of the units in stock which were produced in month t are ruined; 47% of the units in stock which were produced in month t-1 are ruined; 100% of the units in stock which were produced in month t-2 are ruined. The stock inspection for month 2 is just about to take place.

The company wants a production plan for the next six months that avoids stockouts. Formulate their problem as a linear program.

Because of the stock deterioration problem the managing director is thinking of directing that customers should always be supplied with the oldest stock available. How would this affect your formulation of the problem?

Solution

Variables

Let

Pt be the production (units) in month t (t=3,...,8)

Iit be the number of units in stock at the end of month t which were produced in month i (i=t,t-1,t-2)

Sit be the number of units in stock at the beginning of month t which were produced in month i (i=t-1,t-2)

dit be the demand in month t met from units produced in month i (i=t,t-1,t-2)

Constraints

Pt <= 6000

I22 = 1000

I12 = 2000

I02 = 500

St-1,t = 0.89It-1,t-1

St-2,t = 0.53It-2,t-1

closing stock = opening stock + production - demand

and we have

It,t = 0 + Pt - dt,t

It-1,t = St-1,t + 0 - dt-1,t

It-2,t = St-2,t + 0 - dt-2,t

where

dt,t + dt-1,t + dt-2,t = Dt

all inventory (I,S) and d variables >= 0

Objective

Presumably to minimise cost and this is given by

SUM{t=3 to 8}15Pt + SUM{t=3 to 9}0.75(St-1,t+St-2,t) + SUM{t=3 to 8}25(0.11It,t+0.47It-1,t+1.0It-2,t)

Note because we are told to formulate this problem as a linear program we assume all variables are fractional - in reality they are likely to be quite large and so this is a reasonable approximation to make (also a problem occurs with finding integer values which satisfy (for example) St-1,t=0.89It-1,t-1 unless this is assumed).

If we want to ensure that demand is met from the oldest stock first then we can conclude that this is already assumed in the numerical solution to our formulation of the problem since (plainly) it worsens the objective to age stock unnecessarily and so in minimising costs we will automatically supply (via the dit variables) the oldest stock first to satisfy demand (although the managing director needs to tell the employees to issue the oldest stock first).


Linear programming example 1986 UG exam

A company assembles four products (1, 2, 3, 4) from delivered components. The profit per unit for each product (1, 2, 3, 4) is £10, £15, £22 and £17 respectively. The maximum demand in the next week for each product (1, 2, 3, 4) is 50, 60, 85 and 70 units respectively.

There are three stages (A, B, C) in the manual assembly of each product and the man-hours needed for each stage per unit of product are shown below:

                           Product
                      1        2       3       4
Stage         A       2        2       1       1
              B       2        4       1       2
              C       3        6       1       5

The nominal time available in the next week for assembly at each stage (A, B, C) is 160, 200 and 80 man-hours respectively.

It is possible to vary the man-hours spent on assembly at each stage such that workers previously employed on stage B assembly could spend up to 20% of their time on stage A assembly and workers previously employed on stage C assembly could spend up to 30% of their time on stage A assembly.

Production constraints also require that the ratio (product 1 units assembled)/(product 4 units assembled) must lie between 0.9 and 1.15.

Formulate the problem of deciding how much to produce next week as a linear program.

Solution

Variables

Let

xi = amount of product i produced (i=1,2,3,4)

tBA be the amount of time transferred from B to A

tCA be the amount of time transferred from C to A

Constraints

x1 <= 50

x2 <= 60

x3 <= 85

x4 <= 70

0.9 <= (x1/x4) <= 1.15

i.e. 0.9x4 <= x1 and x1 <= 1.15x4

2x1 + 2x2 + x3 + x4 <= 160 + tBA + tCA

2x1 + 4x2 + x3 + 2x4 <= 200 - tBA

3x1 + 6x2 + x3 + 5x4 <= 80 - tCA

tBA <= 0.2(200)

tCA <= 0.3(80)

Objective

maximise 10x1 + 15x2 + 22x3 + 17x4

Note we neglect the fact that the xi variables should be integer because we are told to formulate the problem as an LP.


Linear programming example

A company makes three products and has available 4 workstations. The production time (in minutes) per unit produced varies from workstation to workstation (due to different manning levels) as shown below:

                           Workstation
                      1        2       3       4
Product       1       5        7       4       10
              2       6        12      8       15
              3       13       14      9       17

Similarly the profit (£) contribution (contribution to fixed costs) per unit varies from workstation to workstation as below

              
                      Workstation
                      1        2       3       4
Product       1       10       8       6       9
              2       18       20      15      17
              3       15       16      13      17

If, one week, there are 35 working hours available at each workstation how much of each product should be produced given that we need at least 100 units of product 1, 150 units of product 2 and 100 units of product 3. Formulate this problem as an LP.

Solution

Variables

At first sight we are trying to decide how much of each product to make. However on closer inspection it is clear that we need to decide how much of each product to make at each workstation. Hence let

xij = amount of product i (i=1,2,3) made at workstation j (j=1,2,3,4) per week.

Although (strictly) all the xij variables should be integer they are likely to be quite large and so we let them take fractional values and ignore any fractional parts in the numerical solution. Note too that the question explicitly asks us to formulate the problem as an LP rather than as an IP.

Constraints

We first formulate each constraint in words and then in a mathematical way.

5x11 + 6x21 + 13x31 <= 35(60)

7x12 + 12x22 + 14x32 <= 35(60)

4x13 + 8x23 + 9x33 <= 35(60)

10x14 + 15x24 + 17x34 <= 35(60)

x11 + x12 + x13 + x14 >= 100

x21 + x22 + x23 + x24 >= 150

x31 + x32 + x33 + x34 >= 100

Objective

Presumably to maximise profit - hence we have

maximise

10x11 + 8x12 + 6x13 + 9x14 + 18x21 + 20x22 + 15x23 + 17x24 + 15x31 + 16x32 + 13x33 + 17x34


Production planning problem

Consider the production of tin cans which are stamped from metal sheets. A can consists of a main body and two ends,. We have 4 possible stamping patterns (involving 2 different types (sizes) of metal sheet). as shown below

We have the following information:

                                                Pattern
                                       1       2        3       4
Type of sheet used                     1       2        1       1
Number of main bodies                  1       4        2       0
Number of ends                         7       4        3       9
Amount of scrap                        s1      s2        s3      
s4
Time to stamp (hours)                  t1      t2        t3      
t4

Note here that the si (i=1,2,3,4) and the ti (i=1,2,3,4) are not variables but constants (which have a known value). Often in formulating LP's it is easier to use a symbol for a number rather than write out the number in full every time it occurs in a constraint or in the objective function.

Let P be the profit obtained from selling one can, C be the cost per unit of scrap, T be the total number of hours available per week, L1 be the number of metal sheets of type 1 which are available for stamping per week and L2 be the number of metal sheets of type 2 which are available for stamping per week.

At the start of the week there is nothing in stock. Each (unused) main body in stock at the end of the week incurs a stock-holding cost of c1. Similarly each (unused) end in stock at the end of the week incurs a stock-holding cost of c2. Assume that all cans produced one week are sold that week.

How many cans should be produced per week?

Production planning solution

Variables

Let

xi be the number of patterns of type i (i=1,2,3,4) stamped per week

y be the number of cans produced per week

Note xi >= 0 i=1,2,3,4 and y >= 0 and again we assume that the xi and y are large enough for fractional values not to be significant.

Constraints

t1x1 + t2x2 + t3x3 + t4x4 <= T

x1 + x3 + x4 <= L1 (sheet 1)

x2 <= L2 (sheet 2)

y = min[ (7x1+4x2+3x3+9x4)/2, (x1+4x2+2x3) ]

where the first term in this expression is the limit imposed upon y by the number of can ends produced and the second term in this expression is the limit imposed upon y by the number of can bodies produced. This constraint (because of the min[,] part) is not a linear constraint.

Objective

Presumably to maximise profit - hence

maximise

revenue - cost of scrap - unused main bodies stock - holding cost - unused ends stock - holding cost

i.e. maximise

Py - C(s1x1 + s2x2 + s3x3 + s4x4) - c1(x1 + 4x2 + 2x3 - y) - c2((7x1 + 4x2 + 3x3 + 9x4) - 2y)

As noted above this formulation of the problem is not an LP - however it is relatively easy (for this particular problem) to turn it into an LP by replacing the y = min[,] non-linear equation by two linear equations.

Suppose we replace the constraint

y = min[ (7x1+4x2+3x3+9x4)/2,
(x1+4x2+2x3) ]   (A) 

by the two constraints

y <= (7x1+4x2+3x3+9x4)/2                      (B)
y <= (x1+4x2+2x3)                             (C) 

(which are both linear constraints) then we do have an LP and in the optimal solution of this LP either:

Hence case (b) cannot occur and so case (a) is valid - replacing constraint (A) by constraints (B) and (C) generates a valid LP formulation of the problem.

Note that this problem illustrates that even if our initial formulation of the problem is non-linear we may be able to transform it into an LP.

Note too that it is relatively easy to extend the LP formulation of the problem to cope with the situation where can bodies/ends unused at the end of one week are available for production the following week.


Production planning problem

A company is producing a product which requires, at the final assembly stage, three parts. These three parts can be produced by two different departments as detailed below.

                      Production rate (units/hr)
                      Part 1  Part 2  Part 3   Cost (£/hr)
Department 1          7       6       9        25.0
Department 2          6       11      5        12.5

One week, 1050 finished (assembled) products are needed (but up to 1200 can be produced if necessary). If department 1 has 100 working hours available, but department 2 has 110 working hours available, formulate the problem of minimising the cost of producing the finished (assembled) products needed this week as an LP, subject to the constraint that limited storage space means that a total of only 200 unassembled parts (of all types) can be stored at the end of the week.

Note: because of the way production is organised in the two departments it is not possible to produce, for example, only one or two parts in each department, e.g. one hour of working in department 1 produces 7 part 1 units, 6 part 2 units and 9 part 3 units and this cannot be altered.

Production planning solution

Variables

We need to decide the amount of time given over to the production of parts in each department (since we, obviously, may not make use of all the available working time) and also to decide the total number of finished (assembled) products made. Hence let:

xi = number of hours used in department i (i=1,2)

y = number of finished (assembled) products made

where xi >= 0 i=1,2 and y >= 0 and (as is usual) we assume that any fractional parts in the variables in the numerical solution of the LP are not significant.

Constraints

x1 <= 100

x2 <= 110

1050 <= y <= 1200

We produce (7x1 + 6x2) part 1 units, (6x1 + 11x2) part 2 units and (9x1 + 5x2) part 3 units. Now to ensure that the number of assembled products produced is exactly y we need at least y part 1 units, at least y part 2 units and at least y part 3 units. Hence we have the three constraints

7x1 + 6x2 >= y

6x1 + 11x2 >= y

9x1 + 5x2 >= y

22x1 + 22x2 - 3y <= 200

Objective

minimise 25.0x1 + 12.5x2

Obvious extensions to this problem involve increasing (from the current value of 3) the number of parts needed for the finished product and changing the ratio of parts used in a finished product from its current value of 1:1:1.